Construction Proxy

Construction Cost Estimator

Live-informed BOQ estimates for Ethiopian construction — Addis Ababa direct-cost pricing, updated quarterly.

For budgetary use only. This estimate is not a substitute for a detailed design and quantity survey. For an exact, legally binding calculation, please contact a professional/registered engineering consultant. For certified professional quantity surveying, cost estimation, and property valuation services, we recommend Profound Engineering PLC (profound.et).
1
Project
2
Structure
3
Finishes
4
MEP
5
Review

Project & location

Villa, Apartment and Mixed-use are priced. Apartment/Mixed-use pricing is valid up to G+10.

Structure

This is the ground-floor footprint — the area repeated on each floor, not the total of all floors combined.
0 = ground floor only (G+0). The ground floor is always included.
Priced as a full floor for now.

Finishes

All selections below change the price: exterior wall, roof, windows profile, floor finish and paint — plus wet rooms and electrical/sanitary quality on the next step.
Interior partitions are always 10 cm HCB, cement plastered.
Internal doors are always wooden flush; entrance is steel security.

Electrical & sanitary (MEP)

Same note as Finishes — these are recorded but not yet priced separately.

Review & calculate

Estimate summary


Unlock the itemized Excel BOQ — 1000 ETB

Send 1000 ETB via TeleBirr to 0911425829, then submit your transaction reference below. We verify manually and send your download link once confirmed.

Questions? Call us for a free consultation: 0911425829